HVAC Commissioning

Field Sign-Off Checklist

Equipment

Model
Carrier 25HCB648A003
Serial
4521A88732
Location
Rooftop Unit 2 — Bldg A

Commissioning Steps

  • Refrigerant charge verified
  • Airflow measured (CFM)
  • Static pressure within spec
  • Electrical connections torqued
  • Voltage & amperage logged
  • Thermostat calibrated
  • Condensate drain tested
  • Filter installed & clean
  • Safety controls verified
  • System cycle test complete
0 / 10 complete

Customer Info

NameRiverside Office Park
Phone(555) 384-2910
Address1440 Commerce Blvd, Suite 200

Sign-Off Summary

Complete the checklist, then generate the AI sign-off verdict.

Past Jobs

No completed jobs yet.